Saturday, December 31, 2016

New Church Building Construction

Saturday, December 31, 2016
2/1/17 - Bob is building some panels for the wall below the baptistry. One has been completed.
2/1/17 - The second panel will soon be done.
2/1/17 - Robert is in one of the side rooms next to the platform putting baseboard around the bottom of the walls.
2/2/17 - The concrete guys have arrived have poured most of the sidewalks.
2/2/17 - The concrete guys have arrived have poured most of the sidewalks.
2/2/17 - The concrete guys have arrived have poured most of the sidewalks.
2/2/17 - The sidewalks in the back and a small section in the front are all that is left to do.
2/2/17 - The sidewalks in the back and a small section in the front are all that is left to do.
2/2/17 - The sidewalks in the back and a small section in the front are all that is left to do.
2/2/17 - The sidewalks in the back and a small section in the front are all that is left to do.
2/2/17 - The large pad on the right side of the church.
2/2/17 - The sidewalks in the back and a small section in the front are all that is left to do.
2/2/17 - Pouring the last couple of sections.
2/2/17 - The sidewalk leading to the main entrance.
2/2/17 - The small section on the front, right side that is waiting to be finished.
2/2/17 - A small panorama of the action going on.
2/2/17 - While the concrete is being poured trenches are still being dug for the sprinkler system.
2/2/17 - While the concrete is being poured trenches are still being dug for the sprinkler system.
2/2/17 - Inside, Robert is putting windows in the classroom doors.
2/2/17 - Bob is still working hard in the sanctuary.
2/2/17 - Bob is still working hard in the sanctuary.
2/2/17 - Bob built a fold down panel to cover the side window of the baptistry, it gives it a great finished look. When someone is baptized the panel is folded down.
2/2/17 - Bob built a fold down panel to cover the side window of the baptistry, it gives it a great finished look. When someone is baptized the panel is folded down.
2/2/17 - Here is the panel folded down.
2/2/17 - The top plate is removed. When the baptistry is finished there will be a window covering the gap.
2/2/17 - Another angle with the top plate removed.
2/2/17 - Back outside, the concrete guys have finished pouring the remainder of the sidewalks.
2/2/17 - Back outside, the concrete guys have finished pouring the remainder of the sidewalks.
2/2/17 - Back outside, the concrete guys have finished pouring the remainder of the sidewalks.
2/3/17 - Several more light poles have been put up.
2/3/17 - 24 Hours later, the concrete has hardened. We had some rain during the night but it didn't affect the concrete.
2/3/17 - 24 Hours later, the concrete has hardened.
2/3/17 - 24 Hours later, the concrete has hardened.
2/3/17 - 24 Hours later, the concrete has hardened.
2/3/17 - 24 Hours later, the concrete has hardened.
2/3/17 - Bob and Robert have been busy. It looks like they have moved out of the sanctuary and into the foyer. Shadow box trim has been added.
2/3/17 - Bob and Robert have been busy. It looks like they have moved out of the sanctuary and into the foyer. Shadow box trim has been added.
2/3/17 - It looks like Bob has finished the trim around the baptistry, now its waiting to be painted.
2/3/17 - A view of the left side of the sanctuary so far.
2/3/17 - A view of the right side of the sanctuary so far.
2/3/17 - A view of the rear of the sanctuary so far.
2/3/17 - A view of the front of the sanctuary so far.
2/6/17 - More gravel was brought in and spread over the dirt driveway of the side entrance to the church.
2/6/17 - More gravel was brought in and spread over the dirt driveway of the side entrance to the church.
2/6/17 - A row of trees was planted in front of the water retention pond.
2/6/17 - The sidewalks are dry and fully hardened now.
2/6/17 - The sidewalks are dry and fully hardened now.
2/6/17 - Bob and Robert have been busy installing shadowbox trim in the hallway leading to the fellowship hall.
2/6/17 - Here is the view of the shadowbox trim in the hallway looking from the doorway of the fellowship hall.
2/6/17 - The shadowbox trim in the foyer.

About Aiken Seventh-day Adventist Church

The Aiken Seventh-day Adventist church was founded in the 1950s by a handful of believers who began meeting together in each other’s houses.  Over the last 60+ years our membership has grown and worship facilities have been enlarged.  Construction of our new church building is complete.  We have started holding services at our new building since April 1st 2017!