Saturday, December 31, 2016

New Church Building Construction

Saturday, December 31, 2016
1/26/17 - A wide shot of the fellowship hall and the kitchen area.
1/26/17 - Bob is finishing the trim around the big window.
1/26/17 - Bob is finishing the trim around the big window.
1/27/17 - It looks like they finished filling the islands with dirt yesterday.
1/27/17 - It looks like they finished filling the islands with dirt yesterday.
1/27/17 - It looks like they finished filling the islands with dirt yesterday.
1/27/17 - The painters are finishing priming all of the walls and ceiling. This is the inside of one of the classrooms.
1/27/17 - Another shot of the kitchen area. The painters have covered most of the doors, windows.
1/27/17 - Another shot of the kitchen area. The painters have covered most of the doors, windows.
1/27/17 - The hallway leading from the kitchen.
1/27/17 - Another view of the fellowship hall from the doorway of the hall.
1/27/17 - The hallway leading from the fellowship hall, the painters have it primed.
1/27/17 - The sanctuary so far.
1/27/17 - The sanctuary so far.
1/27/17 - The sanctuary so far.
1/27/17 - The sanctuary so far.
1/27/17 - The sanctuary so far.
1/27/17 - The foyer facing the main entrance.
1/27/17 - The foyer from the main entrance.
1/27/17 - The main window Bob worked hard on.
1/30/17 - Landscaping is underway outside. The guys are smoothing and leveling the ground and preparing the islands for some grass.
1/30/17 - Bobby is smoothing the grade next to our side parking area getting it ready for some grass.
1/30/17 - The painters are still working inside painting the trim and chair rails.
1/30/17 - You can see where the chair rails have been sprayed.
1/30/17 - Bob is still working on his masterpiece around the baptistry opening.
1/30/17 - Bob has been working hard cutting and fitting all of the details for a couple of weeks now.
1/31/17 - Our contractor Larry Gervais is working outside building forms for the base of our columns in preparation for the concrete guys arriving in a couple of days.
1/31/17 - The two deep holes the steel posts have been sitting in are filled with concrete now.
1/31/17 - A closer view of one of the two forms.
1/31/17 - The painters have finished with the trim and have started painting the walls. This is a view toward the kitchen area.
1/31/17 - Another view of the kitchen.
1/31/17 - A view of the entrance of the fellowship hall from the kitchen.
1/31/17 - A wide shot of the rear of the sanctuary.
1/31/17 - Bob is adding more trim to the baptistry.
1/31/17 - An overall view of the baptistry and Bob's work so far.
1/31/17 - An overall view of the baptistry and Bob's work so far.
2/1/17 - Several things are going on outside the church today. Trenches are being dug for the sprinklers to water the islands, concrete guys are building forms for the sidewalks and a couple of light poles and been put in.
2/1/17 - Trenches are being dug all around the building.
2/1/17 - Concrete guys are building forms for the sidewalks and the drive through at the front entrance.
2/1/17 - The sidewalk goes around the side of the building
2/1/17 - The sidewalk leading to the front entrance.
2/1/17 - You can see one of the trenches in the foreground and the side walk around the back in the background.
2/1/17 - A wider angle around back.
2/1/17 - Footers have been dug for the staircase to the upper room.
2/1/17 - The concrete guys are putting in the forms for one of the front sidewalks.
2/1/17 - One of the light poles in the side parking area.
2/1/17 - Both light poles.
2/1/17 - The concrete form on the left side of the front.
2/1/17 - The painters are doing the detail painting on the walls, around the trim.
2/1/17 - A wide shot of the sanctuary, Bob is still working on the trim.

About Aiken Seventh-day Adventist Church

The Aiken Seventh-day Adventist church was founded in the 1950s by a handful of believers who began meeting together in each other’s houses.  Over the last 60+ years our membership has grown and worship facilities have been enlarged.  Construction of our new church building is complete.  We have started holding services at our new building since April 1st 2017!