2/22/17 - The toilets have been installed as well.
2/22/17 - The foyer lights look good.
2/22/17 - It looks like the baptistry window is cured and solid.
2/22/17 - The main sanctuary lights are working too!
2/22/17 - The main sanctuary lights are working too!
2/22/17 - The main sanctuary lights are working too!
2/22/17 - The main sanctuary lights are working too!
2/22/17 - The main sanctuary lights are working too!
2/22/17 - The main sanctuary lights are working too!
2/22/17 - The electricians left a lot of cardboard to break down and throw away.
2/22/17 - Robert is putting the backing on the cabinets now that the counter tops are on.
2/23/17 - The guys are back today working on the stairs.
2/23/17 - The guys are back today working on the stairs.
2/23/17 - The guys are back today working on the stairs.
2/23/17 - Robert is putting in the knobs and handles for the cabinets.
2/23/17 - Robert is putting in the knobs and handles for the cabinets.
2/23/17 - The rubberized covering has been put on the baptistry stairs.
2/24/17 - Another nice day today, the temperature was around 80°F or more.
2/24/17 - The electricians put the lights on top of the poles today.
2/24/17 - The electricians put the lights on top of the poles today.
2/24/17 - A little more progress on the stairs today.
2/24/17 - The electricians added the lights outside the kitchen door.
2/24/17 - Robert put up the back splash today.
2/24/17 - Robert also put a lot of the doorknobs on the doors today as well.
2/24/17 - The drinking fountains have been installed, they have power but no water yet.
2/24/17 - You can see for yourself what is being installed today, it doesn't look quite finished yet.
2/26/17 - The guys are still working on the the stairs, they are getting close to being done.
2/26/17 - The guys are still working on the the stairs, they are getting close to being done.
2/26/17 - The guys are still working on the the stairs, they are getting close to being done.
2/26/17 - Work bee today. Several members of the church came out to help clean the church in preparation for the carpet install in a few days.
2/26/17 - Work bee today. Several members of the church came out to help clean the church in preparation for the carpet install in a few days.
2/26/17 - Work bee today. Several members of the church came out to help clean the church in preparation for the carpet install in a few days.
2/26/17 - Work bee today. Joan and Henry are cleaning the floors in the upstairs room and hallway.
2/26/17 - Work bee today. Joan didn't expect her picture to be taken.
2/26/17 - Work bee today. You can see Joan in the window and Henry in the background cleaning the floors in the upstairs hallway.
2/26/17 - Work bee today. Pastor Ben behind the mask, has been sweeping the floors.
2/26/17 - Work bee today. Cleaning the fellowship hall.
2/27/17 - The stove, along with the refrigerator has been put in place.
2/27/17 - Unfortunately the cabinet door closest to the refrigerator won't open all the way because the refrigerator stick out too far.
2/27/17 - We are getting ready to put the main projector screen up in the ceiling. It is almost 11 feet long and weighs about 100 pounds.
2/27/17 - The plate the projector screen will hang on is already up, we will have to get the screen up there as well.
2/28/17 - The stairs are almost done, the guys working on it haven't been here in a few days, I guess they have another job they are working on.
2/28/17 - The carpet is here. The carpet for the building was delivered today. This is all of the carpet for the entire building.
2/28/17 - The carpet is here. The carpet for the building was delivered today. This is all of the carpet for the entire building.
2/28/17 - You may be able to see the colors and texture of the carpet. The black is what the back side of the squares looks like.
2/28/17 - The carpet is here. The carpet for the building was delivered today. This is all of the carpet for the entire building.
3/1/17 - Robert and Larry have been working all day on these door latches. One door latch took 5-6 hours to put on. Apparently they were drilled at the factory incorrectly, now we have to try to work around it.
3/1/17 - The heating guys have been here the last several days finishing installing the heating and air system.
3/1/17 - Not much work has been going on outside recently, a guy has been clearing the scrub brush around the property.
3/1/17 - Not much work has been going on outside recently, the guy is clearing brush from the area to the right of the church.

About Aiken Seventh-day Adventist Church

The Aiken Seventh-day Adventist church was founded in the 1950s by a handful of believers who began meeting together in each other’s houses.  Over the last 60+ years our membership has grown and worship facilities have been enlarged.  Construction of our new church building is complete.  We have started holding services at our new building since April 1st 2017!