2/13/17 - Mulch is starting to be spread on the islands in the parking lot.
2/13/17 - The heating guys are back. They are installing our new furnaces.
2/13/17 - The painters are nearing the finish line, the foyer and hallway are almost done.
2/13/17 - The painters are nearing the finish line, the foyer and hallway are almost done.
2/13/17 - Robert has been busy installing the partitions in the men's bathroom.
2/13/17 - The painters have finished priming the doors and now are in the process of painting them.
2/13/17 - One of the painters working on the details at the baptistry.
2/13/17 - One of the new furnaces partially installed.
2/14/17 - A lot of activity going on outside today. The are using the roller to compact the gravel at the drive through.
2/14/17 - A lot of activity going on outside today. The are using the roller to compact the gravel at the drive through.
2/14/17 - Some landscaping is being done out in front, near the highway. The surface of the ground has been cleaned off and hay and grass has been planted.
2/14/17 - A wider shot near the highway.
2/14/17 - The ground near the right corner of the driveway entrance is being cleared back.
2/14/17 - The side yard, next to the parking lot has hay waiting.
2/14/17 - It looks like lumber has been delivered, most likely for the staircase.
2/14/17 - A dirt pad is being prepared where the storage container will be placed.
2/14/17 - Robert and Larry discussing the bolts that are needed to install the partitions in the bathroom. I think they were missing a few.
2/14/17 - As you can see, Robert has finished installing the partitions in the women's bathroom. It was a lot more work than it looks.
2/14/17 - The partitions are also done in the men's bathroom. The door is all that is left.
2/14/17 - The painters are finishing the detail work in the foyer.
2/14/17 - The hallway detail work was just finished.
2/14/17 - The doors are finished and now they are drying
2/14/17 - It looks like the detail work is most finished on baptistry area.
2/15/17 - The landscaping out near the highway is continuing.
2/15/17 - The landscaping out near the highway is continuing. You can see the strips of hay that have been put down.
2/15/17 - The landscaping out near the highway is continuing.
2/15/17 - More of the land on the right side of the entrance has been cleared back.
2/15/17 - The storage container was moved onto the pad today.
2/15/17 - The freshly painted doors are dry and have been hung back up in the doorways.
2/15/17 - The freshly painted doors are dry and have been hung back up in the doorways.
2/15/17 - The hallways look like they are finished now and the doors are back up.
2/15/17 - The foyer is done as well.
2/15/17 - The door in the men's bathroom has been installed now.
2/15/17 - A baby changing station has been put on the wall in the women's bathroom.
2/15/17 - The foyer and door to the mother's room.
2/15/17 - The sanctuary looks bigger now that all of the doors are out of there.
2/15/17 - The sanctuary looks bigger now that all of the doors are out of there.
2/15/17 - The sanctuary looks bigger now that all of the doors are out of there.
2/15/17 - The baptistry is mostly done, there is some detail work to do around the window area.
2/15/17 - Robert is installing a door closer on the door in the kitchen.
2/15/17 - Another load of lights waiting to be installed.
2/16/17 - More progress on the landscaping. Trenches have been dug to water the trees.
2/16/17 - More progress on the landscaping. Trenches have been dug to water the trees.
2/16/17 - Trenches have also been dug to water the grass near the highway.
2/16/17 - More trenches in the back of the church. These are for power for RV parking outside.
2/16/17 - More trenches in the back of the church. These are for power for RV parking outside.
2/16/17 - More trenches in the back of the church. These are for power for RV parking outside.
2/16/17 - Four new AC units have been put in place.
2/16/17 - The painters are done for now. They will be back later on to touch up anything damaged during the fixture and carpet install coming up.
2/16/17 - The painters are done for now. Larry and Robert spent some time cleaning up the wood and cardboard scraps as well as the dirt on the floor.

About Aiken Seventh-day Adventist Church

The Aiken Seventh-day Adventist church was founded in the 1950s by a handful of believers who began meeting together in each other’s houses.  Over the last 60+ years our membership has grown and worship facilities have been enlarged.  Construction of our new church building is complete.  We have started holding services at our new building since April 1st 2017!