Saturday, December 31, 2016

New Church Building Construction

Saturday, December 31, 2016
2/6/17 - The shadowbox trim in the foyer.
2/6/17 - Bob has been working to install the handrails for the stairways, this is a wide shot of the platform before he installed the handrails.
2/6/17 - The stairway leading upstairs, the handrails were just installed earlier.
2/6/17 - Robert has been putting in shelves in the storage closets upstairs.
2/6/17 - This half of the closet is still waiting for it's shelves.
2/6/17 - More shelves.
2/6/17 - Bob and Robert still cutting wood.
2/6/17 - Bob is halfway done with the handrails in the baptistry.
2/7/17 - The sprinkler guy has been running wire for the sprinkler system.
2/7/17 - The sprinkler guy has been running wire for the sprinkler system.
2/7/17 - Bobby and his guys have spread the gravel from the other day to level out the difference between the concrete and the rest of the parking area in the drive through.
2/7/17 - Packing down the gravel at the edge of the concrete.
2/7/17 - Its pretty much even.
2/7/17 - Robert spent several hours making a sturdy shelf above the door in the utility closet. Its made from three layers of plywood and finished with a nice wood veneer.
2/7/17 - Bob has installed one of the two handrails for the platform.
2/7/17 - It looks like he has also finished the handrails in the baptistry.
2/7/17 - The last of the two handrails for the platform is waiting to be finished.
2/8/17 - It looks like Bobby and his guys have planted trees in the islands around the parking lot.
2/8/17 - It looks like Bobby and his guys have planted trees in the islands around the parking lot.
2/8/17 - It looks like Bobby and his guys have planted trees in the islands around the parking lot.
2/8/17 - Robert has been hanging doors, some are waiting, some are done.
2/8/17 - A number of light fixtures have been delivered.
2/8/17 - The doors leading from the fellowship hall to the hallway.
2/8/17 - One of the classroom doors and the the fellowship hall doors on the left.
2/8/17 - The Mother's Room door on the right and Robert hanging closet doors on the left.
2/8/17 - Robert has installed the counter in the women's bathroom.
2/8/17 - Robert has installed the counter in the men's bathroom as well.
2/8/17 - You can see Bob working on the desktop in the AV Loft.
2/8/17 - The A/V desk in progress.
2/8/17 - Bob working on the desk frame.
2/8/17 - The finished frame waiting on the desktop. Bob has to laminate a veneer to the front of the frame to make it look nice before the top is put in place.
2/9/17 - The painters are back. Bob and Robert have finished the trim work and the painters have come back to paint the last of the trim.
2/9/17 - The painters are back. Bob and Robert have finished the trim work and the painters have come back to paint the last of the trim. Robert is installing the door closer.
2/9/17 - The painters are back. Bob and Robert have finished the trim work and the painters have come back to paint the last of the trim.
2/9/17 - This section of the wall was covered by a lot of doors. The trim was added and the painters have sprayed on the primer.
2/9/17 - Bob finished the A/V desk. His work is done and he has gone back home to North Carolina. He did an excellent job and went above and beyond what was needed, namely the extra detail work he did on the baptistry. Thank you very much Bob!!!
2/9/17 - Bob laminated the face of the plywood stack he used as the front piece under the desktop so it matches the the actual desktop.
2/9/17 - The painters used the upstairs room as a paint booth to paint the primer on a group of doors.
2/9/17 - The painters are cleaning up the sanctuary floor getting ready to paint the rest of the doors with primer.
2/9/17 - The sanctuary floor looks better.
2/10/17 - Another nice day at the church.
2/10/17 - The sprinkler guy has put soaker hoses around the base of all of the planted trees in each of the islands.
2/10/17 - The paint guys have been spraying primer on the new trim.
2/10/17 - The paint guys have been spraying primer on the new trim.
2/10/17 - Shelves have been lined up and sprayed with primer.
2/10/17 - The painters have removed all of the doors and stood them up in the sanctuary and sprayed them with primer.
2/10/17 - The painters have removed all of the doors and stood them up in the sanctuary and sprayed them with primer.
2/10/17 - The painters also sprayed Bob's baptistry work with primer. with primer.
2/10/17 - A look at the sanctuary from above.
2/13/17 - Mulch is starting to be spread on the islands in the parking lot.

About Aiken Seventh-day Adventist Church

The Aiken Seventh-day Adventist church was founded in the 1950s by a handful of believers who began meeting together in each other’s houses.  Over the last 60+ years our membership has grown and worship facilities have been enlarged.  Construction of our new church building is complete.  We have started holding services at our new building since April 1st 2017!