12/4/17 - Doors and frames.
12/4/17 - Doors and frames.
1/5/17 - Laying out the locations for the islands in the parking lot.
1/5/17 - Laying out the locations for the islands in the parking lot.
1/5/17 - Assembling one of the islands in the parking lot.
1/5/17 - Assembling one of the islands in the parking lot.
1/5/17 - More doors have arrived, large and small.
1/5/17 - More doors have arrived, large and small.
1/6/17 - Another island installed.
1/6/17 - Another island installed.
1/6/17 - Another island installed.
1/9/17 - A panorama of the parking area showing a couple of the islands in place.
1/9/17 - Prepping the floor drains before tile is laid. The drains were set too deep in the concrete so a large area around the drain has to be chiseled away to create a smooth taper to the drain for the tiles.
1/10/17 - Robert's brother Nelus is mixing tile cement. Robert and Nelus are installing the tile for the church.
1/10/17 - Robert and Nelus installing tile on the floor of the women's bathroom.
1/10/17 - Almost done with the women's bathroom floor, just a few tiles to go.
1/11/17 - The cabinets have arrived for the kitchen in the fellowship hall.
1/11/17 - The cabinets have arrived for the kitchen in the fellowship hall.
1/11/17 - The doors are also getting setup for installation.
1/11/17 - The tile has all been laid on the floor in the women's bathroom.
1/11/17 - The tile has all been laid on the floor in the women's bathroom.
1/11/17 - The tile has also been laid on the floor in the men's bathroom.
1/11/17 - The tile has also been laid on the floor in the men's bathroom.
1/11/17 - Some of the doors have been installed at the front of the sanctuary.
1/11/17 - Robert and Nelus are continuing to install tile on the floor of the baptistry area.
1/12/17 - Another island is being added to the church parking lot.
1/12/17 - Another island is being added to the church parking lot.
1/12/17 - Another island is being added to the church parking lot.
1/12/17 - A wider photo of the activity in the parking lot..
1/12/17 - Heyward Jeffcoat and Pastor Ben Reuda are installing the cabinets in the kitchen.
1/12/17 - Heyward Jeffcoat and Pastor Ben Reuda are installing the cabinets in the kitchen.
1/12/17 - Heyward Jeffcoat and Pastor Ben Reuda are installing the cabinets in the kitchen.
1/12/17 - Nelus putting glue on the wall before putting the tiles on.
1/12/17 - Robert is just about finished with the opposite wall in the women's bathroom.
1/12/17 - Robert is just about finished with the opposite wall in the women's bathroom.
1/12/17 - The tile so far in the baptistry area.
1/13/17 - A 180° panorama of the front of the church. More islands have been put in the parking lot.
1/13/17 - Almost all of the kitchen cabinets have been installed, only a little more to go.
1/13/17 - Almost all of the kitchen cabinets have been installed, only a little more to go.
1/13/17 - Almost all of the kitchen cabinets have been installed, only a little more to go.
1/13/17 - More doors and door frames have also been installed in each of the classrooms.
1/13/17 - Almost all of the tile has been set in the women's bathroom.
1/13/17 - Almost all of the tile has been set in the women's bathroom.
1/13/17 - Almost all of the tile has been set in the women's bathroom.
1/13/17 - There is still some more tile work to do in the Men's bathroom.
1/13/17 - There is still some more tile work to do in the Men's bathroom.
1/13/17 - There is still some more tile work to do in the Men's bathroom.
1/13/17 - All of the door frames have been put into the doorways for the rooms that open into the hallway.
1/13/17 - If you look to the right side of the photo you will see that doors and frames have been put in at the back of the sanctuary.
1/16/17 - The border around the parking lot is being laid.

About Aiken Seventh-day Adventist Church

The Aiken Seventh-day Adventist church was founded in the 1950s by a handful of believers who began meeting together in each other’s houses.  Over the last 60+ years our membership has grown and worship facilities have been enlarged.  Construction of our new church building is complete.  We have started holding services at our new building since April 1st 2017!