Saturday, December 31, 2016

New Church Building Construction

Saturday, December 31, 2016
12/14/16 - Insulation in the wall around the door in the front, right corner of the sanctuary.
12/14/16 - More wall insulation and the front window on the left side of the sanctuary. You can see the blocking between the studs in the center to mount the speakers to.
12/14/16 - A wide shot toward the rear of the sanctuary with all of the insulation installed.
12/14/16 - More of the insulated sanctuary.
12/14/16 - More of the insulated sanctuary.
12/14/16 - A view from the kitchen side of the fellowship hall.
12/16/16 - Loads of Sheetrock have been delivered and the installers are already busy.
12/16/16 - A view from the AV loft of the partially covered sanctuary ceiling .
12/16/16 - The sanctuary ceiling.
12/16/16 - The sanctuary ceiling.
12/16/16 - The sanctuary ceiling.
12/18/16 - A view of the fellowship hall area from the foyer hallway.
12/18/16 - One of the five classrooms partially covered.
12/18/16 - A view from the sanctuary doorway of the almost covered sanctuary.
12/18/16 - Still have the back wall to cover.
12/18/16 - A wide shot of one half the of the sanctuary.
12/18/16 - A wide shot of one half the of the sanctuary.
12/20/16 - The rear of the sanctuary is finished.
12/20/16 - The platform area and the large window over the baptistry.
12/20/16 - A tighter shot of the rear of the sanctuary.
12/20/16 - Taping the walls and cleaning up all of the excess Sheetrock.
12/22/16 - Robert Ibanescu (background) and his brother, Nelus (foreground) are prepping and painting the outside of the church building.
12/22/16 - Robert protecting the shingles against paint spray.
12/22/16 - Prepping the walls.
12/22/16 - A shot of the kitchen area. The Sheetrock finishing guys are filling in all of the seams and holes.
12/22/16 - The fellowship hall taken from the kitchen area.
12/22/16 - Robert, still making his way around the top edge of the roof.
12/22/16 - A closer look.
12/22/16 - Robert's brother Nelus walking by.
12/22/16 - Robert's brother Nelus walking by.
12/22/16 - Still working hard.
12/22/16 - No, he hasn't fallen off.
12/27/16 - Painting of the outside of the church is finished. Robert and his brother worked though the Christmas holiday, including Christmas day.
12/27/16 - Guys are working on installing the fence around the water retention pond.
12/27/16 - Guys are working on installing the fence around the water retention pond.
12/27/16 - The finishing guys are still working on covering the seams.
12/27/16 - The sanctuary is mostly done.
12/27/16 - The sanctuary is mostly done.
12/28/16 - The outside so far. The dumpster has all of the Sheetrock and wood scraps. The storage container in the middle is for extra storage. That won't be it's permanent location though.
12/28/16 - The rear of the church.
12/28/16 - Filling more seams.
12/28/16 - Filling more seams.
12/28/16 - Filling more seams.
1/3/17 - Continuing the fence around the retention pond.
1/3/17 - Continuing the fence around the retention pond.
1/4/17 - The fence is finished.
1/4/17 - The fence is finished.
1/4/17 - A load of trim as been delivered.
1/4/17 - A wide shot of the rear of the sanctuary. Along with the trim several doors and frames have also been delivered.
12/4/17 - Doors and frames.

About Aiken Seventh-day Adventist Church

The Aiken Seventh-day Adventist church was founded in the 1950s by a handful of believers who began meeting together in each other’s houses.  Over the last 60+ years our membership has grown and worship facilities have been enlarged.  Construction of our new church building is complete.  We have started holding services at our new building since April 1st 2017!

Save

Save

Save